Current GB rules

Is plug-in solar legal in the UK?

The short answer is yes in Great Britain, but only within a defined and still-evolving product and network route.

Published Reviewed

Regulatory reviewRules checked 29 September 2026

This page describes the evidence available on the checking date. It is not legal or electrical advice. Recheck all live requirements before purchase or installation.

Where and when this route applies

Plug-in solar became legal in Great Britain from 27 August 2026. The connection-and-use route described here applies in Great Britain only: it does not currently extend to Northern Ireland. Although the 2026 plug-approval amendment (SI 2026/848, regulations 1–2) extends to Northern Ireland, the matching electricity-network amendment (regulation 3) extends to Great Britain only. Northern Ireland therefore retains the plug-approval route but not the GB connection-and-use exception; it remains governed by the Electricity Safety, Quality and Continuity Regulations (Northern Ireland) 2012 (SR 2012/381), which provides no plug-in-solar exception. Do not apply the GB route to a Northern Ireland property unless the Northern Ireland position changes.

Primary source · checked 29 September 2026

DESNZ commencement announcement: Records the Great Britain start date. Open source.

Primary legislation · checked 29 September 2026

SI 2026/848 (Plugs and Sockets etc. (Safety) Regulations 1994 and Electricity Safety, Quality and Continuity Regulations 2002 (Amendment) Regulations 2026): In force 27 August 2026. Regulations 1–2 (the plug-approval route) extend to England, Wales, Scotland and Northern Ireland; regulation 3 (the GB connection-and-use network amendment) extends to Great Britain only. Open legislation.

Primary legislation · checked 29 September 2026

Electricity Safety, Quality and Continuity Regulations (Northern Ireland) 2012 (SR 2012/381), article 23: The current Northern Ireland parallel-operation rule for a source of energy that may be connected in parallel with a distributor's network, including the low-voltage notification route at article 23(2). It does not provide the Great Britain plug-in-solar exception. Open legislation.

What the current route covers

The DESNZ Interim Product Specification describes a plug-in device with a maximum rated output of 800 VA, connected current not exceeding 3.5 A and photovoltaic DC input not exceeding 2,000 W. A compliant kit is intended to connect through a suitable standard socket.

Primary source · checked 29 September 2026

DESNZ Interim Product Specification: Defines the temporary GB product requirements, ratings and connection arrangement. Open source.

The device-count distinction is not settled

The Interim Product Specification permits one device up to 800 VA per household circuit. Current GB network requirements (G98 Issue 2 Amendment 1, 2026, as named in the DESNZ Interim Product Specification) restrict deployment to one device per household unless and until G98 is amended. This must be live-verified against the current network requirements before publication, purchase or connection.

Live uncertainty

Do not infer that several household circuits automatically permit several devices. The product specification and network rule are separate controls and may not yet align.

Primary government response · checked 29 September 2026

DESNZ government response: Records the transitional position and intended alignment between the product specification and network requirements. Open source.

DNO notification

The current route requires the Distribution Network Operator to be notified under G98 within 28 days. Under G98 the notification obligation sits with the installer; for a consumer-installed kit, the device owner is responsible for ensuring the DNO receives the notification and should retain evidence of it. Product evidence should include current ENA register information and the required plug-approval and declaration-of-conformity evidence, not only a retailer's description or a general conformity mark.

ENA-authored network rule · checked 29 September 2026

ENA Engineering Recommendation G98, Issue 2 Amendment 1 (2026): The current GB network rule for fully type-tested micro-generators, named as the current network requirement in the DESNZ Interim Product Specification. Access it from the official ENA publication pages and verify the issue and amendment live before publication; the previously cited third-party mirror held the unamended 2025 issue and is no longer the authoritative reference. Open ENA publication pages.

Primary live register · checked 29 September 2026

ENA Connect Direct device database: The current device-register search is the product-level verification point to refresh before publication. Open source.

Physical export and SEG are different questions

Physical export to the grid can occur. The household value case should be based primarily on self-consumption. SEG eligibility is not automatic: the installation and installer must be certified under MCS or an accredited equivalent, export metering capable of half-hourly readings must be in place, and the SEG licensee's terms apply. Because plug-in solar sits outside MCS's installation scope, SEG eligibility and payment for a self-installed kit are currently unconfirmed unless such certification and a named supplier's acceptance can be evidenced.

Primary source · checked 29 September 2026

Ofgem Smart Export Guarantee: Explains the scheme, metering and evidence framework that applies separately from the plug-in product route. Open source.

Primary source · checked 29 September 2026

GOV.UK Smart Export Guarantee guidance: Sets out the certification (MCS or an accredited equivalent), export metering and SEG licensee requirements. Open source.

Batteries sit outside this route

Plug-in battery systems and plug-in solar integrated with batteries are outside the current plug-in solar route. The statutory definition of a plug-in microgenerator (SI 2026/848) is a device that is not designed to import electricity from the installation for storage and later supply, beyond permitted auxiliary functions. That does not become a route-compliant plug-in product merely because an electrician is involved; the applicable alternative product, installation and network requirements need separate assessment.

Primary source · checked 29 September 2026

DESNZ plug-in solar consultation: Defines the scope and development of the current route. Open source.

When an electrician is needed

Fixed electrical work — for example adding or modifying a socket or circuit — must comply with the applicable wiring and building requirements, which in England includes Part P, and should be carried out by a competent electrician. Separately, it is prudent to consult a competent electrician where the consumer cannot safely establish that the existing socket, circuit and installation are suitable. Simply plugging in an approved no-modification kit is not itself fixed electrical-installation work.

Socket, adaptor and wiring safety

Use the device only through the suitable standard socket arrangement specified for the compliant kit. Do not use an extension lead, multi-way adaptor or daisy-chain the connection. Do not connect to damaged, degraded or non-compliant socket-outlets. Older, unknown-condition or fuse-protected installations should be assessed by a competent electrician before connection; age alone does not make a property unsuitable, but condition must be established.

Where sockets or circuits must be added or altered, the work must follow the applicable wiring requirements, including BS 7671, and, in England, the requirements described by Part P. If existing-installation suitability cannot be established safely, consult a competent electrician before connection.

Primary source · checked 29 September 2026

DESNZ plug-in solar safety research: Government-commissioned safety evidence informing the route, including connection and existing-installation risks. Open source.

Primary source · checked 29 September 2026

Approved Document P: Government guidance for electrical safety in dwellings in England. Open source.

MCS and the plug-in route

MCS describes plug-in solar as outside the scope of its installation scheme. That fact does not itself determine physical export or SEG entitlement; export-payment qualification remains a separate certification, metering and supplier question, and without MCS or an accredited-equivalent certification a self-installed plug-in kit currently has no automatic SEG route.

Primary source · checked 29 September 2026

MCS: Its published position on plug-in solar and the boundary with MCS-certified installations. Open source.